Revolutionizing Electric Arc Furnace Power Supply
Cutting-edge power supply system that eliminates flicker, improves power quality, and reduces energy consumption by 15-20%. Hybrid MMC technology with IGBT for unlimited power and deployment in weeks.
The New Era of Efficient Steelmaking
ArcPower Elite is a state-of-the-art power supply system specifically designed for electric arc furnaces (EAF). Using a back-to-back AC-DC-AC architecture with hybrid MMC and IGBT converters, it provides total control over the power delivered to the furnace.
With a capacity of 80 MVA per unit (96 MVA at 30-minute overload) and unlimited scalability, ArcPower Elite radically transforms steel mill operational efficiency, reducing energy costs, electrode consumption, and melting times.

Two Versions, One Solution
Adapted to every type of electric arc furnace
ArcPower Elite AC
Alternating current output for conventional EAF furnaces.
ArcPower Elite DC
Direct current output for DC electric arc furnaces.
Superior Power Quality
Meeting the most demanding standards
| Parameter | Performance |
|---|---|
| Flicker (Pst) | <= 0.3 |
| THDi | < 1.5% |
| Power Factor | > 0.99 |
| Phase Unbalance | < 0.5% |
| Infraharmonics | < 0.2% |
Performance Gains
Measurable impact on every melting cycle
Direct reduction in electricity consumption per ton of steel
Lower electrode wear thanks to a more stable and controlled arc
Greater effective melting time, fewer interruptions and downtime
Competitive Advantage
ArcPower Elite vs. the competition
| Feature | ArcPower Elite | Danieli Q-One | DIRAM HPC | GE DirectFeed |
|---|---|---|---|---|
| CAPEX Index | 40 | 100 | 85 | 130 |
| Install Time | 30 days | 3-6 months | 2-4 months | 6-12 months |
| Max Power | Unlimited | Standard | Standard | 400 MW |
| Deployment | Container | Retrofit | Retrofit | Fixed |
Why ArcPower Elite
vs. established competitor solutions
No power limit through parallelization
Not months. Plug-and-play container deployment
Container Deployment
Plug-and-play installation in under 72 hours
- Standard 40ft ISO container
- Pre-wired and factory pre-tested
- Full installation in under 72 hours
- No complex civil works
- Relocatable and scalable
- Maintenance accessible from the exterior
Extreme power for the industry that moves the world
Contact our industrial engineering team for a customized study of your electric arc furnace.